What is your project’s true health?
Five project signals — schedule performance, slippage, critical-path exposure, physical progress, and field coverage — combined into a single health score with delay risk and end-of-time estimates.
—
Enter your project signals above to generate the health score.
Replace manual inputs with live data from the field.
- Connect Primavera P6 and Opteam auto-calculates SPI, critical-path risk, and progress — no manual entry
- Field teams submit progress via mobile; coverage gaps are flagged before they affect the score
- Health score trends are tracked over time so you can prove improvement to stakeholders
Score model: weighted composite of SPI (35%), days-behind adjusted for progress (25%), critical-path risk (25%), field coverage (15%). EOT exposure derived from critical-path float consumption rate. Simulation only — not a substitute for professional schedule analysis.
Track project health in real time.
Connect your P6 schedule and Opteam calculates and tracks these signals automatically — no manual entry, no stale data.
Project Health Score
' +'Weighted model: SPI 35%, delay 25%, CP risk 25%, field coverage 15%. Simulation only.
' +'